Q. Bike path on Willowdale needs repair. (Sept 06)

A. Response from Operations: Needs to be reconstructed/finished. May look at this in 2008.

Response from Operations: Scheduled for 2008. (Oct 07)

Q. Sidewalk in front of 36 Silver Birch – 7 years. (Sept 06)

A. Response from Operations: Will check this spring and will inform property owner on timeline for repair. (Sept 06)

Response from Operations: Will look at this get back with a timeline to fix.

I have asked for an update from operations on when this will be looked at. (Sept 07)

Response from Operations: Will be completed this year. (Oct 07)

Q. Bikepath between houses on Marquis (between Marquis and 26th/Maryland). Has been in bad shape for 10 years and nothing has been done with it. (Aug 06)

A. Response from Operations: It needs to be reconstructed. We will look at in 2008. (Sept 06)

Response from Operations: We are looking at doing significant repair to bikepaths in 2008. Will look at this then.

Response from Operations: We are currently working on the path. Need to remove some trees that are too close to the path. (Sept 07)

Response from Operations: Work has been completed. (Oct 07)

Q. Bench between McDiarmid and Cherry needs bushes beside. (Sept 06)

A. Response from Operations: We will look at in Spring. (Oct 06)

Response from Operations: Will look at this get back with a timeline to complete.

Response from Operations: Will be completed this fall. (Oct 07)